11 March 2016

Progress




           
 So the weather is getting better here so I could work on the pipes for this vertical garden.

First note to mentioned is use foam-core pipe over solid core pipe. I felt that it would be a good idea to try both foam and solid core pipe, and after using a heat-gun  to heat up the spots I would flatten and flare out I will have to say the foam core did not take much heat to work on with.

A second note build in pairs. I was having trouble trying to keep the pipe from rolling on me while making the slits in the pipe. But if you clamp 2 pipe together then nether will roll.
A good idea is label the planned top and bottom.


No comments:

Post a Comment